Status
On hire
Rental fleet
Where it is
John Holland
Metro Tunnel — Anzac Station, Melbourne
Build cost
$61,330
82 h labour · std $70,045
Load test cert
LT-21-4018
tested 17 Aug 2021 · SWL 50 t
Next load test
25 Sep 2027
in 338 days
Usage (IoT)
4,012 lifts
2,959 run hours
BOM for this machine — serial, batch & COTS record29 serials · 23 batch lines · 28 COTS lines · 0 swapped out
| Item | Serial / batch | Qty | Supplier | Purchase order | Receipt | Cert / MTC / heat | Fitted |
|---|---|---|---|---|---|---|---|
| 031-1012-R0-A SWIVEL ASSEMBLY 50 T (LOAD CELL) | SWV-21-0101 Sub-assy | 1 | Built in-house | — | — 07 Aug 2021 | — | 16 Aug 2021 |
| ↳ 1000121 LOAD CELL 50 T — SWIVEL | LCM-213101 Serial | 1 | LCM Systems | PO-21-1322 | GRN-21-2441 20 May 2021 | LCM cal cert C13101 | 07 Aug 2021 |
| ↳ 031-1011-R0-A SWIVEL BODY — FORGED 4140 Q&T | 031-1011-B03 Batch Heat 7-46324 | 1 | Sunyi Precision Engineering Pte Ltd | PO-20-1277 | GRN-20-2372 10 Nov 2020 | MTC 3.1 — Sunyi 203181 | 07 Aug 2021 |
| ↳ 1000306 SINGLE DIRECTION THRUST BALL BEARING NSK 51124 | 1000306-B03 Batch NSK 24M81 | 1 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2407 18 Feb 2021 | — | 07 Aug 2021 |
| ↳ 017-1016-R0-A M65x4P CASTLE NUT | COTS — not traced | 1 | West Coast Machining Services | PO-18-1120 | GRN-18-2138 14 Oct 2018 | — | 07 Aug 2021 |
| ↳ 1000074 M6 x 1.0 STRAIGHT GREASE NIPPLE SS316 | COTS — not traced | 1 | Direct Fasteners | PO-18-1126 | GRN-18-2125 05 Oct 2018 | — | 07 Aug 2021 |
| 031-1086-R0-A BATTERY PACK ASSEMBLY | BPA-21-0133 Sub-assy | 1 | Built in-house | — | — 08 Aug 2021 | — | 16 Aug 2021 |
| ↳ 1000110 BATTERY MANAGEMENT SYSTEM BOARD 16S | BMS16-5037 Serial | 1 | EV Power Australia | PO-21-1337 | GRN-21-2456 03 Jul 2021 | — | 08 Aug 2021 |
| ↳ 031-1087-R0-A BATTERY BOX FABRICATION | 031-1087-B04 Batch | 1 | Action Laser Cutting | PO-21-1309 | GRN-21-2418 12 Mar 2021 | — | 08 Aug 2021 |
| ↳ 1000501 LiFePO4 PRISMATIC CELL 3.2 V 100 Ah | 1000501-B04 Batch EVE lot 2360-57 | 16 | EV Power Australia | PO-21-1311 | GRN-21-2421 26 Mar 2021 | EV Power CoC 5451 | 08 Aug 2021 |
| ↳ 1000530 MAIN CONTACTOR 48 V 250 A | 1000530-B03 Batch | 1 | Mouser Electronics | PO-20-1282 | GRN-20-2370 03 Nov 2020 | — | 08 Aug 2021 |
| ↳ 1000030 M12 WASHER ZINC PLATED | COTS — not traced | 8 | West Coast Fasteners | PO-18-1127 | GRN-18-2128 08 Oct 2018 | — | 08 Aug 2021 |
| ↳ 1000061 M12 NUT (NORMAL) CLASS 8 ZINC PLATED | COTS — not traced | 8 | Direct Fasteners | PO-18-1126 | GRN-18-2145 22 Oct 2018 | — | 08 Aug 2021 |
| ↳ 1000532 FUSE 250 A MEGA | COTS — not traced | 1 | Mouser Electronics | PO-21-1307 | GRN-21-2412 25 Feb 2021 | — | 08 Aug 2021 |
| 031-1086-R0-A BATTERY PACK ASSEMBLY | BPA-21-0134 Sub-assy | 1 | Built in-house | — | — 09 Aug 2021 | — | 16 Aug 2021 |
| ↳ 1000110 BATTERY MANAGEMENT SYSTEM BOARD 16S | BMS16-5038 Serial | 1 | EV Power Australia | PO-21-1337 | GRN-21-2453 02 Jul 2021 | — | 09 Aug 2021 |
| ↳ 031-1087-R0-A BATTERY BOX FABRICATION | 031-1087-B04 Batch | 1 | Action Laser Cutting | PO-21-1309 | GRN-21-2418 12 Mar 2021 | — | 09 Aug 2021 |
| ↳ 1000501 LiFePO4 PRISMATIC CELL 3.2 V 100 Ah | 1000501-B04 Batch EVE lot 2360-57 | 16 | EV Power Australia | PO-21-1311 | GRN-21-2421 26 Mar 2021 | EV Power CoC 5451 | 09 Aug 2021 |
| ↳ 1000530 MAIN CONTACTOR 48 V 250 A | 1000530-B03 Batch | 1 | Mouser Electronics | PO-20-1282 | GRN-20-2370 03 Nov 2020 | — | 09 Aug 2021 |
| ↳ 1000030 M12 WASHER ZINC PLATED | COTS — not traced | 8 | West Coast Fasteners | PO-18-1127 | GRN-18-2128 08 Oct 2018 | — | 09 Aug 2021 |
| ↳ 1000061 M12 NUT (NORMAL) CLASS 8 ZINC PLATED | COTS — not traced | 8 | Direct Fasteners | PO-18-1126 | GRN-18-2145 22 Oct 2018 | — | 09 Aug 2021 |
| ↳ 1000532 FUSE 250 A MEGA | COTS — not traced | 1 | Mouser Electronics | PO-21-1307 | GRN-21-2412 25 Feb 2021 | — | 09 Aug 2021 |
| 031-1120-R0-A AUXILIARY BATTERY SYSTEM | ABS-21-0104 Sub-assy | 1 | Built in-house | — | — 08 Aug 2021 | — | 16 Aug 2021 |
| ↳ 1000110 BATTERY MANAGEMENT SYSTEM BOARD 16S | BMS16-5039 Serial | 1 | EV Power Australia | PO-21-1331 | GRN-21-2449 10 Jun 2021 | — | 08 Aug 2021 |
| ↳ 031-1087-R0-A BATTERY BOX FABRICATION | 031-1087-B04 Batch | 1 | Action Laser Cutting | PO-21-1309 | GRN-21-2418 12 Mar 2021 | — | 08 Aug 2021 |
| ↳ 1000501 LiFePO4 PRISMATIC CELL 3.2 V 100 Ah | 1000501-B04 Batch EVE lot 2360-57 | 8 | EV Power Australia | PO-21-1311 | GRN-21-2421 26 Mar 2021 | EV Power CoC 5451 | 08 Aug 2021 |
| ↳ 1000532 FUSE 250 A MEGA | COTS — not traced | 1 | Mouser Electronics | PO-21-1307 | GRN-21-2412 25 Feb 2021 | — | 08 Aug 2021 |
| 031-1190-R1-A FLYWHEEL MOTOR ASSEMBLY | FMA-21-0120 Sub-assy | 1 | Built in-house | — | — 11 Aug 2021 | — | 16 Aug 2021 |
| ↳ 031-1100-R0-A FLYWHEEL — MACHINED & BALANCED | 031-1100-S0020 Serial | 1 | West Coast Machining Services | PO-21-1343 | GRN-21-2461 09 Jul 2021 | — | 11 Aug 2021 |
| ↳ 1000101 PROTEAN PD18 IN-WHEEL MOTOR (FLYWHEEL DRIVE) | 70412740 Serial PD18 build 2484 | 1 | Protean Electric | PO-21-1328 | GRN-21-2462 10 Jul 2021 | Protean FAT 12740 | 11 Aug 2021 |
| ↳ 031-1031-R0-A FLYWHEEL BEARING HOUSING STEEL 1045 EN PLATED | 031-1031-B03 Batch | 1 | West Coast Machining Services | PO-20-1278 | GRN-20-2371 09 Nov 2020 | — | 11 Aug 2021 |
| ↳ 031-1032-R0-A FLYWHEEL DRIVE SHAFT STEEL 1045 EN PLATED | 031-1032-B03 Batch | 1 | West Coast Machining Services | PO-20-1278 | GRN-20-2374 20 Nov 2020 | — | 11 Aug 2021 |
| ↳ 1000306 SINGLE DIRECTION THRUST BALL BEARING NSK 51124 | 1000306-B03 Batch NSK 24M81 | 1 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2407 18 Feb 2021 | — | 11 Aug 2021 |
| ↳ 1000307 DEEP GROOVE SEALED BALL BEARING NSK 6824 DDU | 1000307-B03 Batch NSK 22K67 | 2 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2397 07 Feb 2021 | — | 11 Aug 2021 |
| ↳ 1000060 M16 x 40 HEX HEAD BOLT GR 8.8 ZINC PLATED | COTS — not traced | 8 | Direct Fasteners | PO-18-1126 | GRN-18-2143 21 Oct 2018 | — | 11 Aug 2021 |
| ↳ 1000074 M6 x 1.0 STRAIGHT GREASE NIPPLE SS316 | COTS — not traced | 2 | Direct Fasteners | PO-18-1126 | GRN-18-2125 05 Oct 2018 | — | 11 Aug 2021 |
| ↳ 1000080 HKR / MR SERIES LOCK NUT 70 x 2.0P | COTS — not traced | 1 | Nikki Machinery Co. Ltd | PO-18-1109 | GRN-18-2119 29 Sep 2018 | — | 11 Aug 2021 |
| ↳ 1000305 NITRILE V SEAL SKF 401600 181x165x12 | COTS — not traced | 1 | TAT Bearing Pte Ltd | PO-21-1341 | GRN-21-2455 03 Jul 2021 | — | 11 Aug 2021 |
| 031-1190-R1-A FLYWHEEL MOTOR ASSEMBLY | FMA-21-0121 Sub-assy | 1 | Built in-house | — | — 06 Aug 2021 | — | 16 Aug 2021 |
| ↳ 031-1100-R0-A FLYWHEEL — MACHINED & BALANCED | 031-1100-S0021 Serial | 1 | West Coast Machining Services | PO-21-1343 | GRN-21-2477 20 Jul 2021 | — | 06 Aug 2021 |
| ↳ 1000101 PROTEAN PD18 IN-WHEEL MOTOR (FLYWHEEL DRIVE) | 70412777 Serial PD18 build 2334 | 1 | Protean Electric | PO-21-1328 | GRN-21-2476 19 Jul 2021 | Protean FAT 12777 | 06 Aug 2021 |
| ↳ 031-1031-R0-A FLYWHEEL BEARING HOUSING STEEL 1045 EN PLATED | 031-1031-B03 Batch | 1 | West Coast Machining Services | PO-20-1278 | GRN-20-2371 09 Nov 2020 | — | 06 Aug 2021 |
| ↳ 031-1032-R0-A FLYWHEEL DRIVE SHAFT STEEL 1045 EN PLATED | 031-1032-B03 Batch | 1 | West Coast Machining Services | PO-20-1278 | GRN-20-2374 20 Nov 2020 | — | 06 Aug 2021 |
| ↳ 1000306 SINGLE DIRECTION THRUST BALL BEARING NSK 51124 | 1000306-B03 Batch NSK 24M81 | 1 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2407 18 Feb 2021 | — | 06 Aug 2021 |
| ↳ 1000307 DEEP GROOVE SEALED BALL BEARING NSK 6824 DDU | 1000307-B03 Batch NSK 22K67 | 2 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2397 07 Feb 2021 | — | 06 Aug 2021 |
| ↳ 1000060 M16 x 40 HEX HEAD BOLT GR 8.8 ZINC PLATED | COTS — not traced | 8 | Direct Fasteners | PO-18-1126 | GRN-18-2143 21 Oct 2018 | — | 06 Aug 2021 |
| ↳ 1000074 M6 x 1.0 STRAIGHT GREASE NIPPLE SS316 | COTS — not traced | 2 | Direct Fasteners | PO-18-1126 | GRN-18-2125 05 Oct 2018 | — | 06 Aug 2021 |
| ↳ 1000080 HKR / MR SERIES LOCK NUT 70 x 2.0P | COTS — not traced | 1 | Nikki Machinery Co. Ltd | PO-21-1340 | GRN-21-2472 16 Jul 2021 | — | 06 Aug 2021 |
| ↳ 1000305 NITRILE V SEAL SKF 401600 181x165x12 | COTS — not traced | 1 | TAT Bearing Pte Ltd | PO-21-1341 | GRN-21-2455 03 Jul 2021 | — | 06 Aug 2021 |
| 031-1206-R0-A CONTROL ENCLOSURE | CEN-21-0117 Sub-assy | 1 | Built in-house | — | — 12 Aug 2021 | — | 16 Aug 2021 |
| ↳ 031-2021-RA-A WATCHDOG (INTERNAL PANEL MOUNT) | WDG-0017 Serial | 1 | PCBWay | PO-21-1345 | GRN-21-2473 16 Jul 2021 | — | 12 Aug 2021 |
| ↳ 1000196 SA69-0200-1100-C0 UDOO NEO FULL SBC 1GB RAM | UDN18251 Serial | 1 | Digi-Key Electronics | PO-21-1338 | GRN-21-2450 15 Jun 2021 | — | 12 Aug 2021 |
| ↳ 1000198 K66F KINETIS SHIELD PCB — MANUFACTURE & ASSEMBLY | K66S-21-0017 Serial | 1 | PCBWay | PO-21-1327 | GRN-21-2444 26 May 2021 | — | 12 Aug 2021 |
| ↳ 1000427 USR-G800V2 INDUSTRIAL WIFI 4G LTE ROUTER | 86613044102227 Serial | 1 | USRIOT | PO-21-1332 | GRN-21-2445 29 May 2021 | — | 12 Aug 2021 |
| ↳ 1000441 4G SIM CARD | 89611102200289 Serial | 1 | Leader Computers WA | PO-21-1348 | GRN-21-2468 15 Jul 2021 | — | 12 Aug 2021 |
| ↳ 1000460 IMU / HEADING SENSOR MODULE | IMU-21-0017 Serial | 1 | Digi-Key Electronics | PO-21-1338 | GRN-21-2448 09 Jun 2021 | — | 12 Aug 2021 |
| ↳ 1000177 CONTACT PIN SIZE 16 NICKEL 16-18 AWG | COTS — not traced | 55 | Mouser Electronics | PO-20-1258 | GRN-20-2331 08 Jul 2020 | — | 12 Aug 2021 |
| ↳ 1000428 DIN RAIL 5 in (127 mm) | COTS — not traced | 1 | Digi-Key Electronics | PO-21-1329 | GRN-21-2436 10 May 2021 | — | 12 Aug 2021 |
| ↳ 1000444 ANTENNA CABLE WIFI + 4G RG174 SMA 30 cm | COTS — not traced | 2 | Digi-Key Electronics | PO-18-1124 | GRN-18-2137 14 Oct 2018 | — | 12 Aug 2021 |
| ↳ 1000450 CONNECTOR HOUSING 31 POS PANEL MOUNT SIZE 16 | COTS — not traced | 2 | Digi-Key Electronics | PO-20-1250 | GRN-20-2324 24 Jun 2020 | — | 12 Aug 2021 |
| 031-1208-R0-A POWER ENCLOSURE | PEN-21-0117 Sub-assy | 1 | Built in-house | — | — 08 Aug 2021 | — | 16 Aug 2021 |
| ↳ 1000102 SEVCON GEN4 SIZE 4 MOTOR CONTROLLER 48 V | S4-2130119 Serial | 1 | Sevcon (BorgWarner) | PO-21-1333 | GRN-21-2452 25 Jun 2021 | Sevcon EOL test | 08 Aug 2021 |
| ↳ 031-2905-R1-A CANBUS CABLE ASSEMBLY | 031-2905-B03 Batch | 1 | Mouser Electronics | PO-21-1307 | GRN-21-2405 13 Feb 2021 | — | 08 Aug 2021 |
| ↳ 1000530 MAIN CONTACTOR 48 V 250 A | 1000530-B03 Batch | 1 | Mouser Electronics | PO-20-1282 | GRN-20-2370 03 Nov 2020 | — | 08 Aug 2021 |
| ↳ 1000428 DIN RAIL 5 in (127 mm) | COTS — not traced | 1 | Digi-Key Electronics | PO-21-1329 | GRN-21-2436 10 May 2021 | — | 08 Aug 2021 |
| ↳ 1000532 FUSE 250 A MEGA | COTS — not traced | 2 | Mouser Electronics | PO-21-1307 | GRN-21-2412 25 Feb 2021 | — | 08 Aug 2021 |
| 031-1005-R0-A LOAD FRAME — ARM1500 | 031-1005-S0004 Serial Heat 7-45268 | 1 | Action Laser Cutting | PO-21-1335 | GRN-21-2447 09 Jun 2021 | MTC 3.1 — ATA 213942 | 16 Aug 2021 |
| 031-1211-R0-A LOWER BEAM ASSEMBLY | 031-1211-S0004 Serial Heat 6-45072 | 1 | Action Laser Cutting | PO-21-1349 | GRN-21-2467 14 Jul 2021 | MTC 3.1 — ATA 213967 | 16 Aug 2021 |
| 031-1212-R0-A UPPER BEAM ASSEMBLY | 031-1212-S0004 Serial Heat 7-50418 | 1 | Action Laser Cutting | PO-21-1349 | GRN-21-2471 16 Jul 2021 | MTC 3.1 — ATA 215223 | 16 Aug 2021 |
| 1000470 AI PERSONNEL RECOGNITION CAMERA IP67 | PRC-41153 Serial | 1 | Leader Computers WA | PO-21-1348 | GRN-21-2457 03 Jul 2021 | — | 16 Aug 2021 |
| 1000480 RADIO RECEIVER 2.4 GHz | HBC-R880198 Serial | 1 | HBC-radiomatic Australia | PO-21-1334 | GRN-21-2454 02 Jul 2021 | — | 16 Aug 2021 |
| 1000481 REMOTE CONTROL 6-BUTTON 2.4 GHz | HBC-T660187 Serial | 1 | HBC-radiomatic Australia | PO-21-1326 | GRN-21-2446 04 Jun 2021 | — | 16 Aug 2021 |
| 031-2901-R3-A POWER CABLE PACKAGE | 031-2901-B03 Batch | 1 | Mouser Electronics | PO-20-1279 | GRN-20-2366 31 Oct 2020 | — | 16 Aug 2021 |
| 031-2905-R1-A CANBUS CABLE ASSEMBLY | 031-2905-B03 Batch | 1 | Mouser Electronics | PO-21-1307 | GRN-21-2405 13 Feb 2021 | — | 16 Aug 2021 |
| 1000490 FLOODLIGHT, HORN & SPEAKER ASSY | 1000490-B03 Batch | 1 | Digi-Key Electronics | PO-21-1304 | GRN-21-2393 02 Feb 2021 | — | 16 Aug 2021 |
| 1000065 M24 x 220 HEX HEAD BOLT GR 8.8 ZINC PLATED | COTS — not traced | 12 | Direct Fasteners | PO-21-1315 | GRN-21-2417 10 Mar 2021 | — | 16 Aug 2021 |
| 1000083 M24 NYLOC NUT CLASS 8 ZINC PLATED | COTS — not traced | 12 | Direct Fasteners | PO-18-1126 | GRN-18-2147 23 Oct 2018 | — | 16 Aug 2021 |
| 1000321 DECAL — LOAD TEST TAG / WLL LABEL SET | COTS — not traced | 1 | Leader Computers WA | PO-18-1125 | GRN-18-2132 10 Oct 2018 | — | 16 Aug 2021 |
| 1000900 POWDER COAT — ROBORIGGER BLUE (PER FRAME) | COTS — not traced | 1 | Pinnacle Powder Coating | PO-18-1116 | GRN-18-2120 30 Sep 2018 | — | 16 Aug 2021 |
| 1000910 PROOF LOAD TEST & CERTIFICATE (TENSA BAY) | COTS — not traced | 1 | TENSA Equipment | PO-18-1118 | GRN-18-2121 30 Sep 2018 | — | 16 Aug 2021 |
Software & SIM recordrecorded at functional test · updated by IoT
- Kinetis firmware
- 4.2.0
- Management PC
- mgmt 2.6.1
- Kinetis board
- K66F rev B
- Kinetis shield
- Shield v3.0
- SIM ICCID
- 89611102200289
- SIM network
- Telstra
- IoT dashboard
- Configured
- Certification
- LT-21-4018
Service & load test history11 SWOs
SWO-26-0944 Rental return inspection25 Sep 2026CompleteSWO-26-0943 Rental return inspection06 Apr 2026CompleteSWO-25-0942 Rental return inspection24 Dec 2025CompleteSWO-25-0941 Rental return inspection11 Apr 2025CompleteSWO-24-0940 Rental return inspection01 Dec 2024CompleteSWO-24-0939 Rental return inspection09 Feb 2024CompleteSWO-23-0938 Rental return inspection18 Nov 2023CompleteSWO-23-0937 Rental return inspection03 Jul 2023CompleteSWO-23-0936 Rental return inspection02 Apr 2023CompleteSWO-22-0935 Rental return inspection15 Jul 2022CompleteSWO-22-0934 Rental return inspection30 Mar 2022Complete
Hire history12 contracts · 1,535 days on hire
HC-26-0825 John Holland
Metro Tunnel — Anzac Station
28 Sep 2026 – …On hireHC-26-0644 Doric GroupBunbury Hospital redevelopment
26 Apr 2026 – 17 Sep 2026ClosedHC-26-0643 Doric GroupBunbury Hospital redevelopment
06 Jan 2026 – 30 Mar 2026ClosedHC-25-0642 Fortescue — Solomon HubSolomon Hub — Kings OPF shutdown
21 Apr 2025 – 17 Dec 2025ClosedHC-24-0641 Fortescue — Solomon HubSolomon Hub — Kings OPF shutdown
25 Dec 2024 – 07 Apr 2025ClosedHC-24-0640 Kapitol GroupNEXTDC M2 data centre
02 Apr 2024 – 28 Nov 2024ClosedHC-23-0639 Multiplex ConstructionsOne Subiaco
27 Nov 2023 – 03 Feb 2024ClosedHC-23-0638 Freo GroupKwinana Bulk Terminal
09 Aug 2023 – 11 Nov 2023ClosedHC-23-0637 BuiltParramatta Square 3
28 Apr 2023 – 27 Jun 2023ClosedHC-22-0636 Hutchinson BuildersThe Star Gold Coast — Tower 2
05 Sep 2022 – 26 Mar 2023ClosedHC-22-0635 Multiplex ConstructionsOne Subiaco
02 Apr 2022 – 09 Jul 2022ClosedHC-21-0634 Kapitol GroupNEXTDC M2 data centre
25 Sep 2021 – 23 Mar 2022Closed
Roborigger Pty Ltd
1131 Hay St, West Perth WA 6005 · +61 8 9488 4500 · busdev@roborigger.com.au
ABN 41 627 118 590
Traceability record
ARM50-001
Model ARM50-031-1001-R1-A
Built 16 Aug 2021
Load test LT-21-4018 · 17 Aug 2021
Printed 22 Oct 2026
Unit
Roborigger ARM1500-50 — 50 t
Owner / hirer: John Holland
Location: Metro Tunnel — Anzac Station, Melbourne
SWL 50 t
| Item | Serial / batch | Supplier | PO | GRN | Certificate |
|---|---|---|---|---|---|
| 031-1012-R0-A — SWIVEL ASSEMBLY 50 T (LOAD CELL) | SWV-21-0101 | — | — | — | — |
| 031-1086-R0-A — BATTERY PACK ASSEMBLY | BPA-21-0133 | — | — | — | — |
| 031-1086-R0-A — BATTERY PACK ASSEMBLY | BPA-21-0134 | — | — | — | — |
| 031-1120-R0-A — AUXILIARY BATTERY SYSTEM | ABS-21-0104 | — | — | — | — |
| 031-1190-R1-A — FLYWHEEL MOTOR ASSEMBLY | FMA-21-0120 | — | — | — | — |
| 031-1190-R1-A — FLYWHEEL MOTOR ASSEMBLY | FMA-21-0121 | — | — | — | — |
| 031-1206-R0-A — CONTROL ENCLOSURE | CEN-21-0117 | — | — | — | — |
| 031-1208-R0-A — POWER ENCLOSURE | PEN-21-0117 | — | — | — | — |
| 031-1005-R0-A — LOAD FRAME — ARM1500 | 031-1005-S0004 | Action Laser Cutting | PO-21-1335 | GRN-21-2447 | MTC 3.1 — ATA 213942 |
| 031-1100-R0-A — FLYWHEEL — MACHINED & BALANCED | 031-1100-S0021 | West Coast Machining Services | PO-21-1343 | GRN-21-2477 | — |
| 031-1100-R0-A — FLYWHEEL — MACHINED & BALANCED | 031-1100-S0020 | West Coast Machining Services | PO-21-1343 | GRN-21-2461 | — |
| 031-1211-R0-A — LOWER BEAM ASSEMBLY | 031-1211-S0004 | Action Laser Cutting | PO-21-1349 | GRN-21-2467 | MTC 3.1 — ATA 213967 |
| 031-1212-R0-A — UPPER BEAM ASSEMBLY | 031-1212-S0004 | Action Laser Cutting | PO-21-1349 | GRN-21-2471 | MTC 3.1 — ATA 215223 |
| 031-2021-RA-A — WATCHDOG (INTERNAL PANEL MOUNT) | WDG-0017 | PCBWay | PO-21-1345 | GRN-21-2473 | — |
| 1000101 — PROTEAN PD18 IN-WHEEL MOTOR (FLYWHEEL DRIVE) | 70412777 | Protean Electric | PO-21-1328 | GRN-21-2476 | Protean FAT 12777 |
| 1000101 — PROTEAN PD18 IN-WHEEL MOTOR (FLYWHEEL DRIVE) | 70412740 | Protean Electric | PO-21-1328 | GRN-21-2462 | Protean FAT 12740 |
| 1000102 — SEVCON GEN4 SIZE 4 MOTOR CONTROLLER 48 V | S4-2130119 | Sevcon (BorgWarner) | PO-21-1333 | GRN-21-2452 | Sevcon EOL test |
| 1000110 — BATTERY MANAGEMENT SYSTEM BOARD 16S | BMS16-5037 | EV Power Australia | PO-21-1337 | GRN-21-2456 | — |
| 1000110 — BATTERY MANAGEMENT SYSTEM BOARD 16S | BMS16-5039 | EV Power Australia | PO-21-1331 | GRN-21-2449 | — |
| 1000110 — BATTERY MANAGEMENT SYSTEM BOARD 16S | BMS16-5038 | EV Power Australia | PO-21-1337 | GRN-21-2453 | — |
| 1000121 — LOAD CELL 50 T — SWIVEL | LCM-213101 | LCM Systems | PO-21-1322 | GRN-21-2441 | LCM cal cert C13101 |
| 1000196 — SA69-0200-1100-C0 UDOO NEO FULL SBC 1GB RAM | UDN18251 | Digi-Key Electronics | PO-21-1338 | GRN-21-2450 | — |
| 1000198 — K66F KINETIS SHIELD PCB — MANUFACTURE & ASSEMBLY | K66S-21-0017 | PCBWay | PO-21-1327 | GRN-21-2444 | — |
| 1000427 — USR-G800V2 INDUSTRIAL WIFI 4G LTE ROUTER | 86613044102227 | USRIOT | PO-21-1332 | GRN-21-2445 | — |
| 1000441 — 4G SIM CARD | 89611102200289 | Leader Computers WA | PO-21-1348 | GRN-21-2468 | — |
| 1000460 — IMU / HEADING SENSOR MODULE | IMU-21-0017 | Digi-Key Electronics | PO-21-1338 | GRN-21-2448 | — |
| 1000470 — AI PERSONNEL RECOGNITION CAMERA IP67 | PRC-41153 | Leader Computers WA | PO-21-1348 | GRN-21-2457 | — |
| 1000480 — RADIO RECEIVER 2.4 GHz | HBC-R880198 | HBC-radiomatic Australia | PO-21-1334 | GRN-21-2454 | — |
| 1000481 — REMOTE CONTROL 6-BUTTON 2.4 GHz | HBC-T660187 | HBC-radiomatic Australia | PO-21-1326 | GRN-21-2446 | — |
| 031-1011-R0-A — SWIVEL BODY — FORGED 4140 Q&T | 031-1011-B03 | Sunyi Precision Engineering Pte Ltd | PO-20-1277 | GRN-20-2372 | MTC 3.1 — Sunyi 203181 |
| 031-1031-R0-A — FLYWHEEL BEARING HOUSING STEEL 1045 EN PLATED | 031-1031-B03 | West Coast Machining Services | PO-20-1278 | GRN-20-2371 | — |
| 031-1031-R0-A — FLYWHEEL BEARING HOUSING STEEL 1045 EN PLATED | 031-1031-B03 | West Coast Machining Services | PO-20-1278 | GRN-20-2371 | — |
| 031-1032-R0-A — FLYWHEEL DRIVE SHAFT STEEL 1045 EN PLATED | 031-1032-B03 | West Coast Machining Services | PO-20-1278 | GRN-20-2374 | — |
| 031-1032-R0-A — FLYWHEEL DRIVE SHAFT STEEL 1045 EN PLATED | 031-1032-B03 | West Coast Machining Services | PO-20-1278 | GRN-20-2374 | — |
| 031-1087-R0-A — BATTERY BOX FABRICATION | 031-1087-B04 | Action Laser Cutting | PO-21-1309 | GRN-21-2418 | — |
| 031-1087-R0-A — BATTERY BOX FABRICATION | 031-1087-B04 | Action Laser Cutting | PO-21-1309 | GRN-21-2418 | — |
| 031-1087-R0-A — BATTERY BOX FABRICATION | 031-1087-B04 | Action Laser Cutting | PO-21-1309 | GRN-21-2418 | — |
| 031-2901-R3-A — POWER CABLE PACKAGE | 031-2901-B03 | Mouser Electronics | PO-20-1279 | GRN-20-2366 | — |
| 031-2905-R1-A — CANBUS CABLE ASSEMBLY | 031-2905-B03 | Mouser Electronics | PO-21-1307 | GRN-21-2405 | — |
| 031-2905-R1-A — CANBUS CABLE ASSEMBLY | 031-2905-B03 | Mouser Electronics | PO-21-1307 | GRN-21-2405 | — |
| 1000306 — SINGLE DIRECTION THRUST BALL BEARING NSK 51124 | 1000306-B03 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2407 | — |
| 1000306 — SINGLE DIRECTION THRUST BALL BEARING NSK 51124 | 1000306-B03 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2407 | — |
| 1000306 — SINGLE DIRECTION THRUST BALL BEARING NSK 51124 | 1000306-B03 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2407 | — |
| 1000307 — DEEP GROOVE SEALED BALL BEARING NSK 6824 DDU | 1000307-B03 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2397 | — |
| 1000307 — DEEP GROOVE SEALED BALL BEARING NSK 6824 DDU | 1000307-B03 | TAT Bearing Pte Ltd | PO-21-1300 | GRN-21-2397 | — |
| 1000490 — FLOODLIGHT, HORN & SPEAKER ASSY | 1000490-B03 | Digi-Key Electronics | PO-21-1304 | GRN-21-2393 | — |
| 1000501 — LiFePO4 PRISMATIC CELL 3.2 V 100 Ah | 1000501-B04 | EV Power Australia | PO-21-1311 | GRN-21-2421 | EV Power CoC 5451 |
| 1000501 — LiFePO4 PRISMATIC CELL 3.2 V 100 Ah | 1000501-B04 | EV Power Australia | PO-21-1311 | GRN-21-2421 | EV Power CoC 5451 |
| 1000501 — LiFePO4 PRISMATIC CELL 3.2 V 100 Ah | 1000501-B04 | EV Power Australia | PO-21-1311 | GRN-21-2421 | EV Power CoC 5451 |
| 1000530 — MAIN CONTACTOR 48 V 250 A | 1000530-B03 | Mouser Electronics | PO-20-1282 | GRN-20-2370 | — |
| 1000530 — MAIN CONTACTOR 48 V 250 A | 1000530-B03 | Mouser Electronics | PO-20-1282 | GRN-20-2370 | — |
| 1000530 — MAIN CONTACTOR 48 V 250 A | 1000530-B03 | Mouser Electronics | PO-20-1282 | GRN-20-2370 | — |
Every serialised and batch-controlled part currently fitted to this unit, with its supplier, purchase order, goods receipt and certificate. Parts replaced in service are recorded in the unit history held by Roborigger.
Roborigger · load orientation & remote release systems · Perth, Western Australia