Building
031-1208-R0-A
POWER ENCLOSURE
Hours
0 / 6 h
booked / estimated
Cost so far
$2,958
parts $2,958 · labour $0
Result
PEN-26-0147
completed 03 Jun 2026
Issued to this build — 5 BOM linesserial & batch numbers recorded against the sub-assembly
| Item | Type | Req'd | Serial / batch picked | From | Cost | |
|---|---|---|---|---|---|---|
| 1000102 SEVCON GEN4 SIZE 4 MOTOR CONTROLLER 48 V | Serial | 1 | Rack R2-05 | $2,650.00 | Picked | |
| 031-2905-R1-A CANBUS CABLE ASSEMBLY | Batch | 1 | Rack R3-04 | $140.00 | Picked | |
| 1000530 MAIN CONTACTOR 48 V 250 A | Batch | 1 | Small parts S4-04 | $145.00 | Picked | |
| 1000428 DIN RAIL 5 in (127 mm) | COTS | 1 | 1 × COTS (GRN-26-3143) | Small parts S3-08 | $4.20 | Picked |
| 1000532 FUSE 250 A MEGA | COTS | 2 | 2 × COTS (GRN-24-3020) | Small parts S4-05 | $18.44 | Picked |
Timesheets0 h · $0
No hours booked yet — standard 6 h @ $95/h is used until they are.
Roborigger Pty Ltd
1131 Hay St, West Perth WA 6005 · +61 8 9488 4500 · busdev@roborigger.com.au
ABN 41 627 118 590
Build sheet
WO-26-1412
Item 031-1208-R0-A
Due 03 Jun 2026
Supervisor Alex Doyle
Printed 22 Oct 2026
Work order
POWER ENCLOSURE
Parent WO-26-1405
| Item | Description | Qty | Serial / batch | Initial |
|---|---|---|---|---|
| 1000102 | SEVCON GEN4 SIZE 4 MOTOR CONTROLLER 48 V | 1 | S4-2630329 | |
| 031-2905-R1-A | CANBUS CABLE ASSEMBLY | 1 | 031-2905-B08 | |
| 1000530 | MAIN CONTACTOR 48 V 250 A | 1 | 1000530-B09 | |
| 1000428 | DIN RAIL 5 in (127 mm) | 1 | GRN-26-3143 | |
| 1000532 | FUSE 250 A MEGA | 2 | GRN-24-3020 |
Scan each part's barcode when picked. Items must not be swapped without the change being recorded against the WO.