Roborigger

WO-26-1396 — ARMR1500-50 Rugged — 50 t

Unit build
MYOB · exported 28 Sep 2026 Demo 22 Oct 2026
ReleasedPickingAssemblyFunctional testCommissioningComplete
Building
ARMR-031-1301-R0-A
Roborigger ARMR1500-50 Rugged — 50 t
For
Rental fleet
due 23 Mar 2026 · Josh Whitford
Hours
0 / 40 h
booked / estimated
Cost so far
$69,479
parts $69,479 · labour $0
Result
completed 23 Mar 2026
Issued to this build — 20 BOM linesserial & batch numbers recorded against the machine
ItemTypeReq'dSerial / batch pickedFromCost
031-1012-R0-A
SWIVEL ASSEMBLY 50 T (LOAD CELL)
Sub-assy 1
Kitting area
$6,520.06 Picked
031-1086-R0-A
BATTERY PACK ASSEMBLY
Sub-assy 2
Kitting area
Kitting area
$8,391.26 Picked
031-1120-R0-A
AUXILIARY BATTERY SYSTEM
Sub-assy 1
Kitting area
$2,535.72 Picked
031-1190-R1-A
FLYWHEEL MOTOR ASSEMBLY
Sub-assy 2
Kitting area
Kitting area
$21,280.04 Picked
031-1206-R0-A
CONTROL ENCLOSURE
Sub-assy 1
Kitting area
$2,387.85 Picked
031-1208-R0-A
POWER ENCLOSURE
Sub-assy 1
Kitting area
$3,519.09 Picked
031-1211-R0-A
LOWER BEAM ASSEMBLY
Serial 1
Rack R5 (floor)
$2,650.00 Picked
031-1212-R0-A
UPPER BEAM ASSEMBLY
Serial 1
Rack R5 (floor)
$2,850.00 Picked
031-1305-R0-A
LOAD FRAME — ARMR RUGGED (STEEL)
Serial 1
Rack R5 (floor)
$12,800.00 Picked
1000470
AI PERSONNEL RECOGNITION CAMERA IP67
Serial 1
ESD cabinet E3
$1,450.00 Picked
1000480
RADIO RECEIVER 2.4 GHz
Serial 1
ESD cabinet E3
$1,350.00 Picked
1000481
REMOTE CONTROL 6-BUTTON 2.4 GHz
Serial 1
ESD cabinet E3
$1,650.00 Picked
031-2901-R3-A
POWER CABLE PACKAGE
Batch 1
Rack R3-04
$504.40 Picked
031-2905-R1-A
CANBUS CABLE ASSEMBLY
Batch 1
Rack R3-04
$140.00 Picked
1000490
FLOODLIGHT, HORN & SPEAKER ASSY
Batch 1
Small parts S3-05
$300.70 Picked
1000065
M24 x 220 HEX HEAD BOLT GR 8.8 ZINC PLATED
COTS 16
16 × COTS (GRN-23-2928)
Small parts S6-03
$99.36 Picked
1000083
M24 NYLOC NUT CLASS 8 ZINC PLATED
COTS 16
16 × COTS (GRN-24-3027)
Small parts S6-03
$16.48 Picked
1000321
DECAL — LOAD TEST TAG / WLL LABEL SET
COTS 1
1 × COTS (GRN-25-3066)
Small parts S6-08
$13.58 Picked
1000900
POWDER COAT — ROBORIGGER BLUE (PER FRAME)
COTS 1 costed at completion
Subcontract
$540.00
1000910
PROOF LOAD TEST & CERTIFICATE (TENSA BAY)
COTS 1 costed at completion
Service
$480.00
Functional test0 / 9
Commissioning0 / 7
Timesheets0 h · $0
No hours booked yet — standard 40 h @ $95/h is used until they are.