Roborigger

WO-24-1355 — ARM1500-50 — 50 t

Unit build
MYOB · exported 28 Sep 2026 Demo 22 Oct 2026
ReleasedPickingAssemblyFunctional testCommissioningComplete
Building
ARM50-031-1001-R1-A
Roborigger ARM1500-50 — 50 t
For
Rental fleet
due 08 May 2024 · Liam Kerr
Hours
0 / 36 h
booked / estimated
Cost so far
$62,665
parts $62,665 · labour $0
Result
completed 08 May 2024
Issued to this build — 20 BOM linesserial & batch numbers recorded against the machine
ItemTypeReq'dSerial / batch pickedFromCost
031-1012-R0-A
SWIVEL ASSEMBLY 50 T (LOAD CELL)
Sub-assy 1
Kitting area
$6,204.13 Picked
031-1086-R0-A
BATTERY PACK ASSEMBLY
Sub-assy 2
Kitting area
Kitting area
$8,047.44 Picked
031-1120-R0-A
AUXILIARY BATTERY SYSTEM
Sub-assy 1
Kitting area
$2,411.16 Picked
031-1190-R1-A
FLYWHEEL MOTOR ASSEMBLY
Sub-assy 2
Kitting area
Kitting area
$20,242.62 Picked
031-1206-R0-A
CONTROL ENCLOSURE
Sub-assy 1
Kitting area
$2,250.40 Picked
031-1208-R0-A
POWER ENCLOSURE
Sub-assy 1
Kitting area
$3,298.16 Picked
031-1005-R0-A
LOAD FRAME — ARM1500
Serial 1
Rack R5 (floor)
$8,844.46 Picked
031-1211-R0-A
LOWER BEAM ASSEMBLY
Serial 1
Rack R5 (floor)
$2,493.39 Picked
031-1212-R0-A
UPPER BEAM ASSEMBLY
Serial 1
Rack R5 (floor)
$2,681.57 Picked
1000470
AI PERSONNEL RECOGNITION CAMERA IP67
Serial 1
ESD cabinet E3
$1,364.31 Picked
1000480
RADIO RECEIVER 2.4 GHz
Serial 1
ESD cabinet E3
$1,270.22 Picked
1000481
REMOTE CONTROL 6-BUTTON 2.4 GHz
Serial 1
ESD cabinet E3
$1,552.49 Picked
031-2901-R3-A
POWER CABLE PACKAGE
Batch 1
Rack R3-04
$474.59 Picked
031-2905-R1-A
CANBUS CABLE ASSEMBLY
Batch 1
Rack R3-04
$127.77 Picked
1000490
FLOODLIGHT, HORN & SPEAKER ASSY
Batch 1
Small parts S3-05
$282.93 Picked
1000065
M24 x 220 HEX HEAD BOLT GR 8.8 ZINC PLATED
COTS 12
12 × COTS (GRN-23-2928)
Small parts S6-03
$74.52 Picked
1000083
M24 NYLOC NUT CLASS 8 ZINC PLATED
COTS 12
12 × COTS (GRN-24-3027)
Small parts S6-03
$12.36 Picked
1000321
DECAL — LOAD TEST TAG / WLL LABEL SET
COTS 1
1 × COTS (GRN-21-2554)
Small parts S6-08
$12.02 Picked
1000900
POWDER COAT — ROBORIGGER BLUE (PER FRAME)
COTS 1 costed at completion
Subcontract
$540.00
1000910
PROOF LOAD TEST & CERTIFICATE (TENSA BAY)
COTS 1 costed at completion
Service
$480.00
Functional test0 / 9
Commissioning0 / 7
Timesheets0 h · $0
No hours booked yet — standard 36 h @ $95/h is used until they are.