Roborigger

WO-18-1001 — AR10 — 10 t

Unit build
MYOB · exported 28 Sep 2026 Demo 22 Oct 2026
ReleasedPickingAssemblyFunctional testCommissioningComplete
Building
AR10-030-0001-R0-A
Roborigger AR10 — 10 t
For
Rental fleet
due 12 Nov 2018 · Liam Kerr
Hours
0 / 22 h
booked / estimated
Cost so far
$36,522
parts $36,522 · labour $0
Result
completed 12 Nov 2018
Issued to this build — 17 BOM linesserial & batch numbers recorded against the machine
ItemTypeReq'dSerial / batch pickedFromCost
030-1010-R1-A
SWIVEL ASSEMBLY 15 T (LOAD CELL) — AR
Sub-assy 1
Kitting area
$4,034.43 Picked
030-1064-R0-A
15T BI-HOOK ASSEMBLY — AR
Sub-assy 1
Kitting area
$903.69 Picked
031-1086-R0-A
BATTERY PACK ASSEMBLY
Sub-assy 2
Kitting area
Kitting area
$6,884.94 Picked
031-1190-R1-A
FLYWHEEL MOTOR ASSEMBLY
Sub-assy 1
Kitting area
$8,467.94 Picked
031-1206-R0-A
CONTROL ENCLOSURE
Sub-assy 1
Kitting area
$2,128.19 Picked
031-1208-R0-A
POWER ENCLOSURE
Sub-assy 1
Kitting area
$2,888.93 Picked
030-1005-R2-A
MAIN FRAME — AR15
Serial 1
Rack R5 (floor)
$5,995.64 Picked
1000470
AI PERSONNEL RECOGNITION CAMERA IP67
Serial 1
ESD cabinet E3
$1,136.43 Picked
1000480
RADIO RECEIVER 2.4 GHz
Serial 1
ESD cabinet E3
$1,058.05 Picked
1000481
REMOTE CONTROL 6-BUTTON 2.4 GHz
Serial 1
ESD cabinet E3
$1,293.18 Picked
031-2901-R3-A
POWER CABLE PACKAGE
Batch 1
Rack R3-04
$407.55 Picked
1000490
FLOODLIGHT, HORN & SPEAKER ASSY
Batch 1
Small parts S3-05
$242.96 Picked
1000065
M24 x 220 HEX HEAD BOLT GR 8.8 ZINC PLATED
COTS 8
8 × COTS (GRN-18-2118)
Small parts S6-03
$42.64 Picked
1000083
M24 NYLOC NUT CLASS 8 ZINC PLATED
COTS 8
8 × COTS (GRN-18-2147)
Small parts S6-03
$6.88 Picked
1000321
DECAL — LOAD TEST TAG / WLL LABEL SET
COTS 1
1 × COTS (GRN-18-2132)
Small parts S6-08
$10.97 Picked
1000900
POWDER COAT — ROBORIGGER BLUE (PER FRAME)
COTS 1 costed at completion
Subcontract
$540.00
1000910
PROOF LOAD TEST & CERTIFICATE (TENSA BAY)
COTS 1 costed at completion
Service
$480.00
Functional test0 / 9
Commissioning0 / 7
Timesheets0 h · $0
No hours booked yet — standard 22 h @ $95/h is used until they are.